Jim started with the gap between what an association sees and what goes on around it:
"Probably a lot more than is perceived by our customers. There's a lot of logistics that goes into it. There's a lot of planning. There's a lot of communication that has to go on."
For a board, the visible part of a reroof is the crew on the roof. Everything that makes that crew's day possible happens earlier: scope, scheduling, material ordering, permits, resident notices and the approvals that move a project from a signed contract to a start date.
A single-family reroof usually has one decision-maker. A condominium replacement can have a board, a property manager, a design professional and hundreds of residents, each with a stake in how the job runs. Jim named the range of people a contractor has to work with:
"You need to be able to kind of work with fluid situations, different casts of characters. You might have architects, engineers. You have board presidents. You have all sorts of different personality types. And it's not a fast process."
Each of those parties brings its own schedule and approvals. An engineer may be reviewing submittals while the board is setting a meeting date and the property manager is fielding resident questions. Planning a large condo roof replacement means keeping those threads moving at the same time.
Boards sometimes expect work to begin soon after signing. Jim described why a large project rarely works that way:
"It's not something where you just show up and the materials get delivered and you just get started. It's a really long track project. So even though the contract may get signed today, it may not start for a couple of months or there might be some sort of other situation that's going on that needs to be taken into account. And there's a lot of exposure to it."
The months between signature and start can be filled with work an association rarely sees: permitting, ordering and staging materials, coordinating with the design professional, and setting a schedule around the community's daily life. Planning for that lead time keeps a board from promising residents a start date the project was never built to meet.
Jim pointed to the value of having done this specific type of work before:
"...having the history and the time spent and the lessons learned doing this particular type of roofing."
Condominium roofing carries its own logistics: multiple stories, occupied buildings, shared parking and common areas, and a governing board that answers to owners. A contractor with a history on projects of similar size has already worked through the situations a first-timer would meet for the first time on your building.
A few steps follow from the way Jim describes the work: